CMIC Footprint (exploration) and SUMIT (mining)

In the modern exploration context, deep-search and under-cover projects require the integration of 3D structural modelling, constrained geophysical inversion, and expert-system targeting to deliver optimum drillhole targets. Success depends not only on the type and quality of the data but also on how well they are integrated and jointly interpreted.

On the left side "From 3D data integration with constrained inversion". Centre "To structural model. Right side "To 3D potential models and ranked exploration targets".

We are actively taking part in a Canadian Mining Innovation Council (CMIC) research project on discovering new combinations of measurable parameters that define the footprints of ore systems. This project is the largest-ever Canadian mineral exploration R&D project, supported by a collaboration of 24 universities and 27 industry sponsors.

The proposed research aims to improve “exploration success by developing practical applications and approaches to the acquisition, management, integration, and analysis of data that can be used to identify the ore-system footprint at the most distant edge and at depth.” – CMIC-EIC Program Summary

We are co-leaders of the project’s data integration activities, providing both advisory services and modelling software.

At the mine site, integration of 3D geological and rock mass models with 4D mine geometry, stress, microseismicity, and other monitoring data yields the capability of evaluating geotechnical hazard. Sharing consistent, real-time data on equipment performance, rock stability, and various mine monitoring systems ultimately means mining more safely, efficiently, effectively, and with greater economic feasibility.

We have recently been working closely with the Centre for Excellence in Mining Innovation (CEMI) on the Smart Underground Monitoring and Integrated Technologies (SUMIT) program and the Tunnel Boring System (TBS) projects of the Rio Tinto Centre for Underground Mine Construction (RTC-UMC).

The data management side of this program aims to facilitate deep mining research and development by refining the process of data collecting, storing and sharing through a centralized system.

Our contribution to this project will be to create the necessary technology needed to manage multi-disciplinary time-based data and mine models. This data management foundation will be integrated with our quantitative, 4D geohazard evaluation system to support analysis and geotechnical decision-making.

If you are interested in reading more about our data integration work, we invite you to read CIM Magazine’s article on the Rio Tinto data management system for its world-wide block cave mine operations.

John McGaughey – President

John is the founder and President of Mira Geoscience. He has extensive mining industry experience focusing on quantitative, multi-disciplinary 3D and 4D interpretation for mineral exploration and geotechnical decision support. He currently leads our technology strategy and our geotechnical business. Prior to founding Mira Geoscience in 1999, he spent 10 years at the Noranda Technology Centre as a Senior Scientist in their rock mechanics group. He obtained an MSc in geological engineering and a PhD in geophysics from Queen’s University. John is based in Montreal.

Latest news

Software releases
January, 15 2019

Geoscience INTEGRATOR AI for exploration

Geoscience INTEGRATOR, the missing AI link for exploration. This unique web-based data management system is designed...
Read more
Case studies
September, 01 2019

Machine learning in mineral exploration

We have applied machine learning as part of custom solutions to complex exploration and geotechnical problems since 2015...
Read more
Software tips
April, 12 2021

Geological 3D-GIS query

In GOCAD Mining Suite, you can create points at specific geological contacts for the construction of your geological contact surface...
Read more
Virtual Lecture – Archive
January, 19 2021

Depth-to-basement inversion using geometry and homogeneous VPmg inversion

Past event - View here or on our YouTube channel...
Read more
Geoscience ANALYST
February, 17 2020

Bridging the gap

Industry uptake of academic exploration and mining research is often slower than it should be. Academics must focus on innovation and education...
Read more
Software tips
April, 02 2019

Labelling

In Geoscience ANALYST, labels can be added to draw attention to a particular feature in the Viewport by...
Read more
Q&As
July, 26 2021

Q&A Revival Gold Inc.

We discussed Mira Geoscience’s contribution to further understand the Beartrack-Arnett gold project area using modern exploration techniques...
Read more
Software tips
April, 13 2020

Quick selection search tool

In Geoscience INTEGRATOR we added a search box to help you find objects lists such as drillholes, samples, or stations that often have thousands of items...
Read more
Software tips
January, 10 2020

Display multiple objects

In GOCAD save time by displaying multiple objects at once. Simply hold down Ctrl or Shift to multi-select objects, then click on any of their...
Read more
Software tips
February, 02 2019

2D minimum curvature gridding

With Geoscience ANALYST Pro module, you can interpolate numerical data from points, curves and surfaces...
Read more
Software releases
June, 12 2019

VPmg, VPem1D and VPutility release

VP Geophysics Suite releases: VPmg version 9.3, VPem1D version 4.3 and VPutility version 1.2...
Read more
Software releases
April, 06 2020

Geoscience ANALYST v3.0.2 release

This version focuses on functionality upgrades within the Geoscience INTEGRATOR link, along with other updates to general functionality...
Read more

Please contact our team for additional information about our products and services